Bush Fire Assessment Reports for developers: the development application (DA) pathway in NSW


Glass and brick extension on an older sandstone house at dusk, with trees behind

Council will expect a Bush Fire Assessment Report with any development application (DA) on bush fire prone land in NSW. The Development Coordination Authority (DCA) took over bush fire referrals from the NSW Rural Fire Service (RFS) on 1 July 2026. How the report is certified decides whether council has to refer your DA to the DCA. If it does, council has up to 14 days to make the referral, the DCA’s 28 days only start once the fee is paid, and the clock pauses for every information request. Council can’t approve the DA until the DCA responds or its time runs out.

Where the design complies, our reports include the qualified consultant’s certificate of compliance, so council doesn’t have to refer the DA to the DCA. Where it doesn’t comply as drawn, we can give you general advice on the changes likely to bring it into line before you lodge. Every report is prepared by our principal consultant, Jonathan Hardy, who also contracts his time to the DCA reviewing bush fire prone development in NSW.

Building under a complying development certificate (CDC) instead? See our guide to BAL certificates for the CDC pathway in NSW.

What a Bush Fire Assessment Report is, and when a DA needs one

A Bush Fire Assessment Report is the document lodged with a DA to show how the development meets Planning for Bush Fire Protection (PBP). It assesses the vegetation, slope and separation around the proposed building, then sets the Bush Fire Attack Level (BAL) it must be built to, the asset protection zone (APZ), and the access and water requirements.

Bush fire prone land is land shown on your council’s bush fire prone land map, certified by the RFS Commissioner. Before granting consent to development on that land, council must consider PBP, under section 4.14 of the Environmental Planning and Assessment Act 1979 (EP&A Act).

PBP 2019 asks for a Bush Fire Assessment Report with any application on bush fire prone land, showing how the proposal meets it. Councils expect one lodged with the DA, whether it’s a new dwelling that can’t use complying development, a knockdown-rebuild, a dual occupancy, multi-dwelling housing, or alterations and additions.

PBP is being updated, but the draft can’t be relied on until the new version is published and recognised in legislation. Until then PBP 2019 applies, and we’ll update this guide when that changes.

How a DA on bush fire prone land runs from 1 July 2026

1. Check the map

The RFS bush fire prone land tool shows whether a lot is mapped. Its result only holds for the day of the search, so confirm the status on council’s section 10.7 planning certificate before lodging. Or send us the address and we’ll check it for you, no charge.

2. Get the report before you lodge

Commission the report while the design can still move. The APZ, the BAL construction level, and the access and water requirements all affect the site layout and the build cost. If the site or the layout isn’t settled yet, we can start with general advice to guide the design while it can still change. The full report is then prepared against the final plans, so it can carry the compliance certificate in step 3.

3. The compliance certificate and the DCA

Under section 4.11 of State Environmental Planning Policy (Planning Systems) 2021 (the Planning Systems SEPP), council must notify the DCA of a DA on bush fire prone land within 14 days of receiving it, and take into account any DCA comments received within 28 days.

There are two exceptions. Council does not have to notify the DCA where it is satisfied the development complies with the relevant specifications and requirements in PBP, or where it has been given a certificate by a qualified consultant certifying that compliance. A qualified consultant is a person recognised by the RFS as a qualified consultant in bush fire risk assessment. Without a notification, the DA doesn’t wait on the DCA at all.

Where the design complies, our DA reports include that certificate of compliance with PBP, issued under section 4.11 of the Planning Systems SEPP and stating that no referral to the DCA is required. In our experience since 1 July, councils given our certificate have generally not referred the DA to the DCA.

If the design doesn’t comply as drawn, we can give you general advice on the changes likely to bring it into line, such as siting, setbacks, an APZ or the construction level, for you and your designer to work through before you lodge.

4. If the DA is referred

Council has up to 14 days from lodgement to make the referral. The DCA then has 28 calendar days to respond, counted from when the referral is made and the fee is paid, and the clock pauses while any further information is requested. Council can’t approve the DA until the DCA responds or that period runs out. The referral fee is $1,100, paid by the applicant through the NSW Planning Portal.

5. Determination and conditions

Council considers PBP and any DCA comments, then determines the DA. Bush fire conditions on the consent typically set the construction level under AS 3959, the APZ and how it is maintained, and access and water supply. They are drawn from the report, so the report you lodge is the one you build to. Our construction requirements guide covers what each construction level involves.

Does my bushfire report still go to the RFS?

For most DAs lodged on or after 1 July 2026, no. Where a DA needs state input on bush fire, council refers it to the DCA, which the RFS now names as the single point of contact for referrals that used to involve it.

The report is the same document people have long called an RFS bushfire report or an RFS bushfire assessment. It is still prepared to PBP, and it still goes in with the DA.

The RFS is still involved in these cases:

  • DAs lodged before 1 July 2026 and not yet determined run under the previous rules, including referral to the RFS where needed. If a non-minor amendment to one of those DAs is accepted after 1 July, its lodgement date resets and the new rules apply.
  • Subdivision and special fire protection purpose development need a Bush Fire Safety Authority from the RFS after consent (see below).
  • The RFS publishes PBP and certifies the bush fire prone land maps.

What the report contains

PBP 2019 Appendix A2.2 sets out what a report for an infill or other DA must address. Each item has a job:

  • A statement that the site is bush fire prone land. It establishes that PBP applies.
  • The location, extent and vegetation formation of any bushland on or within 140 metres of the site. Vegetation type governs how intense a fire can become, and the distance to it drives the construction level.
  • The slope and aspect of the site and of any bush fire prone land within 100 metres. Fire moves faster upslope, so the slope under the vegetation changes the separation the building needs.
  • Features on or adjoining the site that may reduce bush fire impact. Roads, maintained land and other areas without hazard vegetation can form part of that separation.
  • The likely environmental impact of the proposed protection measures. Clearing or managing vegetation for an APZ can raise biodiversity or other environmental matters that council has to weigh.
  • A site plan showing access, water supply, APZs, BAL requirements and the building footprint in relation to the hazard, with the calculated BAL construction levels. Council and the builder both work from this plan.

The bush fire hazard site assessment

The bush fire hazard site assessment is the set of measurements behind those items. It is taken from each side of the proposed building, using the method in PBP 2019 Appendix 1.

  • Vegetation. The vegetation formation within 140 metres, classified under PBP. Forest, woodland, scrub and grassland burn at different intensities, so the formation sets the radiant heat the building is assessed against.
  • Effective slope. The slope of the land under that vegetation, within 100 metres. Fire runs faster upslope, so bushland below the building on a slope needs more separation.
  • Separation. The distance from the building to the vegetation. It is the one measurement the design can change, through siting, setbacks or an APZ.

The council area’s Forest Fire Danger Index (FFDI) also feeds the calculation. Together they set the building’s BAL.

A bush fire landscape assessment is a different exercise. PBP 2019 sets one out in the strategic bush fire study for land being rezoned. It looks at the likelihood and severity of fire across the wider landscape, and happens before any DA is lodged.

Clad rural house with solar panels and a deck on a grassy rise

For how ratings are calculated, see our BAL ratings explainer.

What you need to supply

Each item below removes a reason for the report to stall.

  • A scaled, dimensioned site plan: Drawn to a stated scale (1:200 is standard for residential lots) and dimensioned, showing lot and DP, street address and a north point, the footprint of every proposed building, setbacks to each boundary, and existing structures, including anything to be demolished. Separation distances are measured off this plan and the report cites the plan it assessed, so an unscaled or unorientated drawing can’t be relied on.
  • Floor plans and elevations, where they exist: AS 3959 construction requirements apply to walls, windows, doors, decks and roofs, so the report needs to know what is being built. For alterations and additions, show existing and new work separately, because the report identifies which part of the building it covers.
  • A description of the development and its use: A dwelling, dual occupancy, multi-dwelling housing, alterations and additions, or a change of use. The use decides which part of PBP applies, and whether the DA is integrated development needing a Bush Fire Safety Authority.
  • For subdivision, the lot layout, roads and any staging: PBP assumes a 15 metre by 15 metre building envelope on each lot unless one is specified, so show envelopes if they are fixed. Staged development must show how APZs, access and water are provided at each stage.
  • Water supply and access, if known: Whether the site has reticulated water and hydrants, and the length and width of the driveway. PBP sets firefighting water and access requirements, and a site without reticulated water needs its own supply.
  • Site photos, if we ask for them: Where no inspection is booked, photos of the site and the vegetation around it let the assessment confirm on the ground what the mapping shows.
Example site plan for a Bush Fire Assessment Report for a DA in NSW, showing scale, boundaries, building footprint and setbacks.
Reference example: drawn to a stated scale, with lot boundaries, north point, building footprint and setbacks to each boundary. Vegetation, slope and contours aren’t needed for the bush fire assessment, which covers those.
Example site plan for alterations and additions in a NSW bushfire area, showing the difference between existing structures and proposed new work.
Reference example: for alterations and additions, clearly distinguish the existing dwelling from the proposed new work. Bush fire construction standards (AS 3959) apply to the new work, so the assessment must identify exactly where it sits.
Example subdivision plan for a NSW bushfire assessment, showing proposed 15x15m building envelopes and boundary setbacks.
Reference example: for subdivision, show a building envelope on each proposed lot, with its setbacks to the new boundaries. If no envelope is shown, PBP 2019 assumes 15 m x 15 m. The envelope’s position sets the separation distances the assessment works from.

What you don’t need to supply

Vegetation classification, effective slope, separation distances, the FFDI or the BAL. Those are outputs of the assessment, worked out under PBP 2019 Appendix 1. Ground levels and contours aren’t needed either: slope is taken from mapping and checked on site or from photos.

Call 0426 440 012 or send the site details through the contact page for a fixed price quote.

Subdivision and special fire protection purpose development

Two kinds of development need a Bush Fire Safety Authority (BFSA) under section 100B of the Rural Fires Act 1997: subdivision of bush fire prone land that could lawfully be used for residential or rural residential purposes, and development for a special fire protection purpose (SFPP), such as schools, child care centres, hospitals, seniors housing and tourist accommodation.

Grassy paddock with a wire fence meeting eucalypt forest below an escarpment

These are integrated development, so they sit outside the section 4.11 notification and follow their own track. Council obtains general terms of approval from the DCA (section 4.47 of the EP&A Act) and the consent must be consistent with them. Once consent is granted, the applicant applies separately to the RFS for the BFSA before carrying out the development.

The report for these applications covers more ground. The Rural Fires Regulation 2022 (section 45) adds threatened species and ecological communities, Aboriginal objects and places, emergency access and egress, fire trail access, and maintenance plans and emergency procedures to the assessment.

We prepare Bush Fire Assessment Reports for subdivision and SFPP DAs, and the Bush Fire Safety Authority application that follows consent.

Preparing it yourself: the RFS Single Dwelling Application Kit

The RFS publishes a Single Dwelling Application Kit for owners building a new house, or altering or adding to one, on bush fire prone land. It suits straightforward jobs: a single dwelling on land with a dwelling entitlement, with no new roads or hydrants. It isn’t designed for dual occupancies or other increases in density, and the RFS notes that not all councils accept it, so check with council first.

Parts of the kit date from 2020 and still describe referral to the RFS. For DAs lodged from 1 July 2026, any state referral goes to the DCA.

PBP itself recommends engaging a recognised consultant for more complex applications. A consultant’s report is the better route when:

  • the vegetation classification or the effective slope is hard to call, because both drive the BAL directly
  • the siting or setbacks need working through to bring the BAL down
  • the development is more than a single dwelling
  • you want a qualified consultant’s certificate lodged with the DA. A self-prepared kit can’t provide one, so the DA stays out of the DCA referral only if council is satisfied on its own assessment that the proposal complies.

Coming from the complying development pathway

Complying development generally isn’t available on land assessed at BAL-40 or Flame Zone (State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, section 1.19A). If the BAL certificate for a CDC comes back at either level, the job needs a DA with a Bush Fire Assessment Report. Our BAL-40 and Flame Zone pages explain what those levels mean for construction, and our guide to BAL certificates for builders covers the CDC side.

For the wider picture on NSW approvals, see our guide to building in bush fire prone areas in NSW and our NSW BAL rating guide. For BAL work in South Australia, see our BAL assessment service.

Turnaround and getting started

Allow around 10 business days from when we have everything listed under what you need to supply. That time comes before you lodge, so it doesn’t add to the DA’s assessment time. Where the design complies, the report goes in with its compliance certificate. Council doesn’t have to refer it to the DCA, so the DA skips the referral wait and the DCA’s 28-day clock.

Each report is based on your plans, mapping, and either a site inspection or photos of the site sent by the landowner or applicant. We’ll tell you which your site needs before we quote.

Jonathan holds Bushfire Planning and Design (BPAD) accreditation with FPA Australia (#50394) and a Graduate Diploma in Bush Fire Protection from Western Sydney University.

Every report is fixed price, quoted once we’ve seen the site details. Call 0426 440 012 or send your site details through. Plans can be emailed to jonathan@bfha.com.au.

Common questions

How do I get a bushfire assessment report for a DA in NSW?

Confirm the land is mapped as bush fire prone, then engage a consultant recognised by the RFS before you lodge. Send a scaled site plan, any floor plans and elevations, and a description of the development. The report, with a compliance certificate where the design complies, is lodged with the DA.

Who reviews a Rural Fire Service bushfire assessment report now?

Council assesses it against PBP. For DAs lodged from 1 July 2026, any state referral goes to the DCA. The RFS still issues Bush Fire Safety Authorities for subdivision and SFPP development after consent.

What legislation applies to a bushfire report for development approval in NSW?

Section 4.14 of the EP&A Act requires council to consider PBP. Section 4.11 of the Planning Systems SEPP sets when the DA goes to the DCA. PBP 2019, as amended, sets the requirements. Subdivision and SFPP development also come under section 100B of the Rural Fires Act 1997.

Does the builder or the developer pay for the bushfire report?

No rule decides it. The report forms part of the DA, so it is usually commissioned by whoever lodges: the owner, the developer, or a builder lodging for them. Settle it in the contract so the report isn’t held up waiting on that decision.

How long is a bushfire report valid in NSW?

Neither the legislation nor PBP sets an expiry for a DA report. The report is tied to the plans and site conditions it assessed, so if the design, the surrounding vegetation or the bush fire prone land map changes, it needs updating.

What qualification do you need to prepare a bushfire assessment report?

The Planning Systems SEPP refers to a person recognised by the RFS as a qualified consultant in bush fire risk assessment. PBP links that recognition to an accreditation scheme, and the RFS points people to the FPA Australia BPAD register. Jonathan holds BPAD accreditation, #50394.

Can you do the bushfire report yourself?

For a straightforward single dwelling, yes, using the RFS Single Dwelling Application Kit, if your council accepts it. A self-prepared kit can’t carry a qualified consultant’s certificate, and it isn’t designed for dual occupancies or subdivision. Preparing it yourself covers when a consultant’s report is the better route.

Does the bushfire report set the APZ and building setbacks?

Yes. The report works out the asset protection zone needed between the building and the bushland, and the setbacks that follow. Distance and construction level work together: the closer the building sits to the hazard, the higher the BAL.

What is a preliminary bushfire assessment report?

The term usually means early bush fire input before you buy a site or settle a design. We provide this as general advice: guidance on what is likely to shape the layout and budget, such as setbacks, construction level, and access and water, while the design can still change. It isn’t a site-specific assessment, because policy and council’s assessment can change before a DA is lodged. The full Bush Fire Assessment Report is then prepared against the final plans.